Benxin Yongxing lab opening
Time:2016-05-31 18:18:25 Views:470
At 8:30am on May 14, 2014, managers and employees in Benxi Yongxing company meet together in the front of laboratory building in the first workshop. Everyone’s face was filled with joy. At this time in laboratory comprehensive building, two hanging red firecrackers with a mold of 8 was waiting for the arrival of auspicious moment. When the minute hand pointed to 8:36am, the blessing and sounds from firecrackers echoed in the sky of Benxi Yongxing with the passionate voice of safety officer Li defu saying “sky and earth in harmony welcome five blessings into our house; the prosperity of output and selling welcome the money in 8 ways.” Lighted firecrackers with hopping sparks reflect red on everyone’s face.
Then under the guidance of the leadership of the company, everybody went together into the laboratory building. Traditional open ceremony officially opened the first glory of Benxin Yongxing cement production.
Looking through the laboratory building, the first floor includes the molding room, curing room, breaking-mold room, test room, analysis room etc. The second floor includes office room for production and locker room. The whole building displays reasonable, bright and neat. Persons who are working in the laboratory are proud to say the decoration of laboratory and settings are comparable to those large cement plants in Shenyang or even better than them.
At present, the installation of cement equipment is processing. Everyone is striving for the trail operation of single machine and linkage machine in the end of May. We believe that the June of Benxi Yongxing will be thriving like the red color of the comprehensive building. Staff in Benxi Yongxing will also strive for the realization of cement production line formally put into production with a more full enthusiasm.